SeedWave · Grants · Madeira
Not because they don't qualify — because nobody told them in time. Here is what is open, how much it pays, until when, and what you need in hand. Every figure links to the official source.
Public contracts signed in Madeira in 2026
0 €
3 714 contracts · open data from IMPIC (Portal BASE) via dados.gov.pt. That is contract spending — business support programmes are a separate pot, and that one you apply for.
Only entries backed by a published call or decree. Announcements without official text stay out.
Verified on 14.09.2026: Law 23/2026 of 1 June removed the maximum eligible ticket cost from the mobility subsidy (now MCT), yet the service page on gov.pt — updated on 09.09.2026 — still shows the €400 cap. Anyone reading the page before deciding is still planning around a limit that no longer exists.
Source: Diário da República · gov.pt SIEEDUpdateThe application deadline for call M2030-2026-21 has been extended to 10 October 2026, 17:00. All other conditions of the call remain unchanged.
Source: IDR, IP-RAM SIEEDUpdateRate grid confirmed: 50% for SMEs outside buildings; for works on the building itself, a 30% base with top-ups reaching 65%. Minimum eligible spend €50,000.
Source: IDE, IP-RAMEach guide in five languages, each language on its own address.
Grants for cafés and restaurants in Madeira 2026 →Which programmes exist (SIEED, digitalisation, start-up, hiring), how much they pay and how to apply. SIEED — applications until 10 October 2026 →Energy Efficiency 2030 (call M2030-2026-21): 50% for SMEs, what it covers in a café or restaurant, and how to apply before the deadline. Digitalising a café in Madeira 2026 — is there an open call? →The honest answer: today there is no open call for digitalisation alone. What closed, and what to prepare now for the next window.A call opens, a deadline moves, a new rate is published — it arrives here in one line. A channel, not a group: your phone stays quiet.
Follow the channelThese guides are written so you can do it yourself — that is what they are for. If you would rather someone ran the application end to end, see who I am and how I work.